Items where Author is "Kis, Tamás"
Up a level |
Number of items: 88.
ISI Article
Date | Author/Title | Document Type | |
---|---|---|---|
2015-09-06 | Györgyi, Péter and Kis, Tamás Reductions between scheduling problems with non-renewable resources and knapsack problems | ISI Article | |
2014 | Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József An inverse economic lot-sizing approach to eliciting supplier cost parameters | ISI Article | |
2013 | Kis, Tamás and Kovács, András Exact solution approaches for bilevel lot-sizing | ISI Article | |
2013 | Nonaka, Y and Erdős, Ferenc Gábor and Kis, Tamás and Kovács, András and Monostori, László and Nakano, T and Váncza, József Generating alternative process plans for complex parts | ISI Article | |
2013 | Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem | ISI Article | |
2013 | Cornuejols, G and Kis, Tamás and Molinaro, M Lifting Gomory Cuts With Bounded Variables | ISI Article | |
2013 | Drótos, Márton and Kis, Tamás Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times | ISI Article | |
2012 | Kis, Tamás and Kovács, András On bilevel machine scheduling problems | ISI Article | |
2012 | Nonaka, Youichi and Erdős, Ferenc Gábor and Kis, Tamás and Nakano, Takahiro and Váncza, József Scheduling with alternative routings in CNC workshops | ISI Article | |
2012 | Kis, Tamás and Kovács, András A cutting plane approach for integrated planning and scheduling | ISI Article | |
2011 | Kovács, András and Kis, Tamás Constraint programming approach to a bilevel scheduling problem | ISI Article | |
2011 | Drótos, Márton and Kis, Tamás Resource leveling in a machine environment | ISI Article | |
2010 | Blazewicz, J. and Ecker, K. and Kis, Tamás and Potts, C. N. and Tanas, M. and Whitehead, J. Scheduling of coupled tasks with unit processing times | ISI Article | |
2010 | Kis, Tamás and de Werra, D. and Kubiak, W. A projective algorithm for preemptive open shop scheduling with two multiprocessor groups | ISI Article | |
2009 | Drótos, Márton and Erdős, Ferenc Gábor and Kis, Tamás Computing lower and upper bounds for a large-scale industrial job shop scheduling problem | ISI Article | |
2009 | Monostori, László and Kis, Tamás and Váncza, József and Kádár, Botond and Erdős, Ferenc Gábor Real-time, cooperative enterprises for customised mass production | ISI Article | |
2009 | Kis, Tamás Scheduling multiprocessor UET tasks of two sizes | ISI Article | |
2008 | de Werra, Dominique and Kis, Tamás and Kubiak, Wieslaw Preemtive open shop scheduling with multiprocessors: polynomial cases and applications | ISI Article | |
2007 | Kis, Tamás and Kápolnai, Richárd Approximations and auctions for scheduling batches on related machines | ISI Article |
Article
Book Section
Date | Author/Title | Document Type | |
---|---|---|---|
2018 | Györgyi, Péter and Kis, Tamás Minimizing the total weighted completion time in single machine scheduling with non-renewable resource constraints | Book Section | |
2017 | Kis, Tamás and Drótos, Márton Hard planning and scheduling problems in the digital factory | Book Section | |
2014 | Drótos, Márton and Kis, Tamás Car Sequencing with respect to Regular Expressions and Linear Bounds | Book Section | |
2006 | Kis, Tamás RCPS with variable intensity activities and feeding precedence constraints | Book Section |
Conference or Workshop Item
Date | Author/Title | Document Type | |
---|---|---|---|
2022 | Kis, Tamás and Györgyi, Péter and Tamási, Tímea and Békési, J Joint replenishment meets scheduling | Conference or Workshop Item | |
2019 | Györgyi, Péter and Kis, Tamás Approximation algorithms for single machine schedulingwith non-renewable resources and the total weightedcompletion time | Conference or Workshop Item | |
2012 | Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters | Conference or Workshop Item | |
2010-08-23 | Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József Approaches to inventory management in supply chains: a comparative study | Conference or Workshop Item | |
2010 | Drótos, Márton and Kis, Tamás Challenges in planning and scheduling in discrete manufacturing and assembly | Conference or Workshop Item | |
2009-06-05 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter Novel IT approaches and solutions towards real-time, cooperative enterprises. Plenary paper | Conference or Workshop Item | |
2009 | Kovács, András and Kis, Tamás Constraint programming approach to a bilevel scheduling problem | Conference or Workshop Item | |
2008 | Monostori, László and Váncza, József and Kis, Tamás and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter Real-time, cooperative enterprises for customized mass production; challenges and solution approaches | Conference or Workshop Item | |
2007-01 | Kéri, András and Kis, Tamás Computing tight time windows for RCPSPWET with the primal-dual method | Conference or Workshop Item | |
2007 | Drótos, Márton and Erdős, Ferenc Gábor and Kis, Tamás New techniques to handle workforce constraints in parallel machine scheduling | Conference or Workshop Item | |
2007 | Monostori, László and Kis, Tamás and Kádár, Botond and Váncza, József and Erdős, Ferenc Gábor Real-time, cooperative enterprises for customised mass production | Conference or Workshop Item | |
2007 | Monostori, László and Salekovics, István and Váncza, József and Kis, Tamás and Kádár, Botond and Farkas, Zoltán Real-time, cooperative enterprises: challenges and results of an industry-academia project | Conference or Workshop Item | |
2006 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises | Conference or Workshop Item | |
2006 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises: requirements and solution approaches | Conference or Workshop Item | |
2006 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises: requirements and solution approaches | Conference or Workshop Item | |
2006 | Kis, Tamás and Drótos, Márton and Erdős, Ferenc Gábor and Kovács, András The interval flow shop model | Conference or Workshop Item | |
2005 | Kápolnai, R. and Kis, Tamás A 2-approximation algorithm and a truthful mechanism for scheduling batches on machines running at different speeds | Conference or Workshop Item | |
2005 | Kéri, A. and Kis, Tamás Primal-dual combined with constraint propagation for solving RCPSPWET | Conference or Workshop Item | |
2005 | Monostori, László and Váncza, József and Márkus, A. and Kis, Tamás and Kovács, András and Erdős, P. and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises: management of changes and disturbances on different levels of production | Conference or Workshop Item |