Items where Author is "Kis, Tamás"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Date | Item Type | No Grouping
Number of items: 86.

1996

DateAuthor/TitleDocument Type
1996Márkus, András and Kis, Tamás and Váncza, József and Monostori, László
A market approach to holonic manufacturing
Article

2005

DateAuthor/TitleDocument Type
2005Kápolnai, R. and Kis, Tamás
A 2-approximation algorithm and a truthful mechanism for scheduling batches on machines running at different speeds
Conference or Workshop Item
2005Kéri, A. and Kis, Tamás
Primal-dual combined with constraint propagation for solving RCPSPWET
Conference or Workshop Item
2005Kis, Tamás
Project scheduling: a review of recent books
Article
2005Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József
Proterv-II: an integrated production planning and scheduling system
Article
2005Monostori, László and Váncza, József and Márkus, A. and Kis, Tamás and Kovács, András and Erdős, P. and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises: management of changes and disturbances on different levels of production
Conference or Workshop Item
2005Kis, Tamás
A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
Article
2005Kis, Tamás and Pesch, E.
A review of exact solution methods for the non-preemptive multiprocessor flowshop problem
Article

2006

DateAuthor/TitleDocument Type
2006Kis, Tamás
Polyhedral results on single node variable upper-bound flow models with allowed configurations
Article
2006Kis, Tamás
RCPS with variable intensity activities and feeding precedence constraints
Book Section
2006Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises
Conference or Workshop Item
2006Monostori, László and Váncza, József and Márkus, András and Kis, Tamás and Kovács, András and Erdős, Ferenc Gábor and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises: management of changes and disturbances in different levels of production
Article
2006Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises: requirements and solution approaches
Conference or Workshop Item
2006Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises: requirements and solution approaches
Conference or Workshop Item
2006Kis, Tamás and Drótos, Márton and Erdős, Ferenc Gábor and Kovács, András
The interval flow shop model
Conference or Workshop Item

2007

DateAuthor/TitleDocument Type
2007-01Kéri, András and Kis, Tamás
Computing tight time windows for RCPSPWET with the primal-dual method
Conference or Workshop Item
2007Kis, Tamás and Kápolnai, Richárd
Approximations and auctions for scheduling batches on related machines
ISI Article
2007Drótos, Márton and Erdős, Ferenc Gábor and Kis, Tamás
New techniques to handle workforce constraints in parallel machine scheduling
Conference or Workshop Item
2007Monostori, László and Kis, Tamás and Kádár, Botond and Váncza, József and Erdős, Ferenc Gábor
Real-time, cooperative enterprises for customised mass production
Conference or Workshop Item
2007Monostori, László and Salekovics, István and Váncza, József and Kis, Tamás and Kádár, Botond and Farkas, Zoltán
Real-time, cooperative enterprises: challenges and results of an industry-academia project
Conference or Workshop Item

2008

DateAuthor/TitleDocument Type
2008de Werra, Dominique and Kis, Tamás and Kubiak, Wieslaw
Preemtive open shop scheduling with multiprocessors: polynomial cases and applications
ISI Article
2008Monostori, László and Váncza, József and Kis, Tamás and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter
Real-time, cooperative enterprises for customized mass production; challenges and solution approaches
Conference or Workshop Item
2008Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Karnok, Dávid and Drótos, Márton and Egri, Péter
Valós időben együttműködő vállalatok: egy ipari-akadémiai projekt eredményei
Article

2009

DateAuthor/TitleDocument Type
2009-06-05Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter
Novel IT approaches and solutions towards real-time, cooperative enterprises. Plenary paper
Conference or Workshop Item
2009Drótos, Márton and Erdős, Ferenc Gábor and Kis, Tamás
Computing lower and upper bounds for a large-scale industrial job shop scheduling problem
ISI Article
2009Kovács, András and Kis, Tamás
Constraint programming approach to a bilevel scheduling problem
Conference or Workshop Item
2009Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond Géza and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter
Novel IT approaches and solutions towards real-time, cooperative enterprises
Article
2009Monostori, László and Kis, Tamás and Váncza, József and Kádár, Botond and Erdős, Ferenc Gábor
Real-time, cooperative enterprises for customised mass production
ISI Article
2009Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Karnok, Dávid and Drótos, Márton and Egri, Péter
Real-time, cooperative enterprises: Results of an industry - academia project
Article
2009Kis, Tamás
Scheduling multiprocessor UET tasks of two sizes
ISI Article

2010

DateAuthor/TitleDocument Type
2010-08-23Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József
Approaches to inventory management in supply chains: a comparative study
Conference or Workshop Item
2010Drótos, Márton and Kis, Tamás
Challenges in planning and scheduling in discrete manufacturing and assembly
Conference or Workshop Item
2010Monostori, László and Erdős, Ferenc Gábor and Kádár, Botond Géza and Kis, Tamás and Kovács, András and Pfeiffer, András and Váncza, József
Digital enterprise solution for integrated production planning and control
Article
2010Blazewicz, J. and Ecker, K. and Kis, Tamás and Potts, C. N. and Tanas, M. and Whitehead, J.
Scheduling of coupled tasks with unit processing times
ISI Article
2010Kis, Tamás and de Werra, D. and Kubiak, W.
A projective algorithm for preemptive open shop scheduling with two multiprocessor groups
ISI Article

2011

DateAuthor/TitleDocument Type
2011Kovács, András and Kis, Tamás
Constraint programming approach to a bilevel scheduling problem
ISI Article
2011Drótos, Márton and Kis, Tamás
Resource leveling in a machine environment
ISI Article

2012

DateAuthor/TitleDocument Type
2012Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József
An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters
Conference or Workshop Item
2012Kis, Tamás and Kovács, András
On bilevel machine scheduling problems
ISI Article
2012Nonaka, Youichi and Erdős, Ferenc Gábor and Kis, Tamás and Nakano, Takahiro and Váncza, József
Scheduling with alternative routings in CNC workshops
ISI Article
2012Kis, Tamás and Kovács, András
A cutting plane approach for integrated planning and scheduling
ISI Article

2013

DateAuthor/TitleDocument Type
2013Balas, E and Cornuejols, G and Kis, Tamás and Nannicini, G
Combining Lift-and-Project and Reduce-and-Split
Article
2013Kis, Tamás and Kovács, András
Exact solution approaches for bilevel lot-sizing
ISI Article
2013Nonaka, Y and Erdős, Ferenc Gábor and Kis, Tamás and Kovács, András and Monostori, László and Nakano, T and Váncza, József
Generating alternative process plans for complex parts
ISI Article
2013Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József
Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem
ISI Article
2013Cornuejols, G and Kis, Tamás and Molinaro, M
Lifting Gomory Cuts With Bounded Variables
ISI Article
2013Drótos, Márton and Kis, Tamás
Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times
ISI Article

2014

DateAuthor/TitleDocument Type
2014Györgyi, Péter and Kis, Tamás
Approximation schemes for single machine scheduling with non-renewable resource constraints
Article
2014Drótos, Márton and Kis, Tamás
Car Sequencing with respect to Regular Expressions and Linear Bounds
Book Section
2014Kis, Tamás
Lift-and-project for general two-term disjunctions
Article
2014Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József
An inverse economic lot-sizing approach to eliciting supplier cost parameters
ISI Article
2014Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József
An inverse economic lot-sizing approach to eliciting supplier cost parameters
Article

2015

DateAuthor/TitleDocument Type
2015-09-06Györgyi, Péter and Kis, Tamás
Reductions between scheduling problems with non-renewable resources and knapsack problems
ISI Article
2015Györgyi, Péter and Kis, Tamás
Approximability of scheduling problems with resource consuming jobs
Article
2015Kis, Tamás
Approximability of total weighted completion time with resource consuming jobs
Article
2015Balas, Egon and Kis, Tamás
Intersection cuts - standard versus restricted
Article
2015Györgyi, Péter and Kis, Tamás
Reductions between scheduling problems with non-renewable resources and knapsack problems
Article
2015Bacsó, Gábor and Kis, Tamás and Visegrádi, Ádám and Kertész, Attila and Németh, Zsolt
A Set of Successive Job Allocation Models in Distributed Computing Infrastructures
Article

2016

DateAuthor/TitleDocument Type
2016Balas, E and Kis, Tamás
On the relationship between standard intersection cuts, lift-and-project cuts, and generalized intersection cuts
Article
2016Horváth, Markó and Kis, Tamás
Solving resource constrained shortest path problems with LP-based methods
Article
2016Horváth, Markó and Kis, Tamás
Solving resource constrained shortest path problems with LP-based methods
Article

2017

DateAuthor/TitleDocument Type
2017Györgyi, Péter and Kis, Tamás
Approximation schemes for parallel machine scheduling with non-renewable resources
Article
2017Kis, Tamás and Drótos, Márton
Hard planning and scheduling problems in the digital factory
Book Section

2018

DateAuthor/TitleDocument Type
2018Horváth, Markó and Kis, Tamás
Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price
Article
2018Györgyi, Péter and Kis, Tamás
Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut
Article
2018Györgyi, Péter and Kis, Tamás
Minimizing the total weighted completion time in single machine scheduling with non-renewable resource constraints
Book Section
2018Horváth, Markó and Kis, Tamás
Multi-criteria approximation schemes for the resource constrained shortest path problem
Article

2019

DateAuthor/TitleDocument Type
2019Györgyi, Péter and Kis, Tamás
Approximation algorithms for single machine schedulingwith non-renewable resources and the total weightedcompletion time
Conference or Workshop Item
2019Györgyi, Péter and Kis, Tamás
Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
Article
2019Nattaf, M and Horváth, Markó and Kis, Tamás and Artigues, C and Lopez, P
Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem
Article
2019Györgyi, Péter and Kis, Tamás
A probabilistic approach to pickup and delivery problems with time window uncertainty
Article

2020

DateAuthor/TitleDocument Type
2020Egri, Péter and Kis, Tamás
Allocating raw materials to competing projects
Article
2020Horváth, Markó and Kis, Tamás
Polyhedral results for position-based scheduling of chains on a single machine
Article
2020Györgyi, Péter and Kis, Tamás
A common approximation framework for early work, late work, and resource leveling problems
Article

2021

DateAuthor/TitleDocument Type
2021Tamási, Tímea and Kis, Tamás
Decentralized and prioritized algorithm for AGV fleet management
Article
2021Kis, Tamás and Kovács, András and Mészáros, Csaba
On Optimistic and Pessimistic Bilevel Optimization Models for Demand Response Management
Article
2021Drótos, Márton and Györgyi, Péter and Horváth, Markó and Kis, Tamás
Suboptimal and conflict-free control of a fleet of AGVs to serve online requests
Article

2022

DateAuthor/TitleDocument Type
2022Horváth, Markó and Kis, Tamás and Kovács, András and Fekula, Márk Zoltán
Assembly planning by disjunctive programming and geometrical reasoning
Article
2022Kis, Tamás and Horváth, Markó
Ideal, non-extended formulations for disjunctive constraints admitting a network representation
Article
2022Kis, Tamás and Györgyi, Péter and Tamási, Tímea and Békési, J
Joint replenishment meets scheduling
Conference or Workshop Item
2022Györgyi, Péter and Kis, Tamás
New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints
Article
2022Morapitiye, Sunil and Kis, Tamás
Strong cuts from compatibility relations for the Dial-a-Ride Problem
Article
2022Morin, P-A and Artigues, C and Haït, A and Kis, Tamás and Spieksma, F C R
A project scheduling problem with periodically aggregated resource-constraints
Article

2023

DateAuthor/TitleDocument Type
2023Györgyi, Péter and Kis, Tamás and Tamási, Tímea and Békési, József
Joint replenishment meets scheduling
Article
2023Egri, Péter and Dávid, B and Kis, Tamás and Krész, Miklós
Robust facility location in reverse logistics
Article
2023Györgyi, Péter and Kis, Tamás and Tamási, Tímea
An online joint replenishment problem combined with single machine scheduling
Article
This list was generated on Thu Mar 28 03:07:23 2024 CET.