Items where Author is "Kis, Tamás"
Up a level |
Number of items: 88.
1996
Date | Author/Title | Document Type | |
---|---|---|---|
1996 | Márkus, András and Kis, Tamás and Váncza, József and Monostori, László A market approach to holonic manufacturing | Article |
2005
2006
Date | Author/Title | Document Type | |
---|---|---|---|
2006 | Kis, Tamás Polyhedral results on single node variable upper-bound flow models with allowed configurations | Article | |
2006 | Kis, Tamás RCPS with variable intensity activities and feeding precedence constraints | Book Section | |
2006 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises | Conference or Workshop Item | |
2006 | Monostori, László and Váncza, József and Márkus, András and Kis, Tamás and Kovács, András and Erdős, Ferenc Gábor and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises: management of changes and disturbances in different levels of production | Article | |
2006 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises: requirements and solution approaches | Conference or Workshop Item | |
2006 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Viharos, Zsolt János Real-time, cooperative enterprises: requirements and solution approaches | Conference or Workshop Item | |
2006 | Kis, Tamás and Drótos, Márton and Erdős, Ferenc Gábor and Kovács, András The interval flow shop model | Conference or Workshop Item |
2007
Date | Author/Title | Document Type | |
---|---|---|---|
2007-01 | Kéri, András and Kis, Tamás Computing tight time windows for RCPSPWET with the primal-dual method | Conference or Workshop Item | |
2007 | Kis, Tamás and Kápolnai, Richárd Approximations and auctions for scheduling batches on related machines | ISI Article | |
2007 | Drótos, Márton and Erdős, Ferenc Gábor and Kis, Tamás New techniques to handle workforce constraints in parallel machine scheduling | Conference or Workshop Item | |
2007 | Monostori, László and Kis, Tamás and Kádár, Botond and Váncza, József and Erdős, Ferenc Gábor Real-time, cooperative enterprises for customised mass production | Conference or Workshop Item | |
2007 | Monostori, László and Salekovics, István and Váncza, József and Kis, Tamás and Kádár, Botond and Farkas, Zoltán Real-time, cooperative enterprises: challenges and results of an industry-academia project | Conference or Workshop Item |
2008
Date | Author/Title | Document Type | |
---|---|---|---|
2008 | de Werra, Dominique and Kis, Tamás and Kubiak, Wieslaw Preemtive open shop scheduling with multiprocessors: polynomial cases and applications | ISI Article | |
2008 | Monostori, László and Váncza, József and Kis, Tamás and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter Real-time, cooperative enterprises for customized mass production; challenges and solution approaches | Conference or Workshop Item | |
2008 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Karnok, Dávid and Drótos, Márton and Egri, Péter Valós időben együttműködő vállalatok: egy ipari-akadémiai projekt eredményei | Article |
2009
Date | Author/Title | Document Type | |
---|---|---|---|
2009-06-05 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter Novel IT approaches and solutions towards real-time, cooperative enterprises. Plenary paper | Conference or Workshop Item | |
2009 | Drótos, Márton and Erdős, Ferenc Gábor and Kis, Tamás Computing lower and upper bounds for a large-scale industrial job shop scheduling problem | ISI Article | |
2009 | Kovács, András and Kis, Tamás Constraint programming approach to a bilevel scheduling problem | Conference or Workshop Item | |
2009 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond Géza and Erdős, Ferenc Gábor and Karnok, Dávid and Egri, Péter Novel IT approaches and solutions towards real-time, cooperative enterprises | Article | |
2009 | Monostori, László and Kis, Tamás and Váncza, József and Kádár, Botond and Erdős, Ferenc Gábor Real-time, cooperative enterprises for customised mass production | ISI Article | |
2009 | Monostori, László and Váncza, József and Kis, Tamás and Kádár, Botond and Karnok, Dávid and Drótos, Márton and Egri, Péter Real-time, cooperative enterprises: Results of an industry - academia project | Article | |
2009 | Kis, Tamás Scheduling multiprocessor UET tasks of two sizes | ISI Article |
2010
Date | Author/Title | Document Type | |
---|---|---|---|
2010-08-23 | Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József Approaches to inventory management in supply chains: a comparative study | Conference or Workshop Item | |
2010 | Drótos, Márton and Kis, Tamás Challenges in planning and scheduling in discrete manufacturing and assembly | Conference or Workshop Item | |
2010 | Monostori, László and Erdős, Ferenc Gábor and Kádár, Botond Géza and Kis, Tamás and Kovács, András and Pfeiffer, András and Váncza, József Digital enterprise solution for integrated production planning and control | Article | |
2010 | Blazewicz, J. and Ecker, K. and Kis, Tamás and Potts, C. N. and Tanas, M. and Whitehead, J. Scheduling of coupled tasks with unit processing times | ISI Article | |
2010 | Kis, Tamás and de Werra, D. and Kubiak, W. A projective algorithm for preemptive open shop scheduling with two multiprocessor groups | ISI Article |
2011
Date | Author/Title | Document Type | |
---|---|---|---|
2011 | Kovács, András and Kis, Tamás Constraint programming approach to a bilevel scheduling problem | ISI Article | |
2011 | Drótos, Márton and Kis, Tamás Resource leveling in a machine environment | ISI Article |
2012
Date | Author/Title | Document Type | |
---|---|---|---|
2012 | Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters | Conference or Workshop Item | |
2012 | Kis, Tamás and Kovács, András On bilevel machine scheduling problems | ISI Article | |
2012 | Nonaka, Youichi and Erdős, Ferenc Gábor and Kis, Tamás and Nakano, Takahiro and Váncza, József Scheduling with alternative routings in CNC workshops | ISI Article | |
2012 | Kis, Tamás and Kovács, András A cutting plane approach for integrated planning and scheduling | ISI Article |
2013
Date | Author/Title | Document Type | |
---|---|---|---|
2013 | Balas, E and Cornuejols, G and Kis, Tamás and Nannicini, G Combining Lift-and-Project and Reduce-and-Split | Article | |
2013 | Kis, Tamás and Kovács, András Exact solution approaches for bilevel lot-sizing | ISI Article | |
2013 | Nonaka, Y and Erdős, Ferenc Gábor and Kis, Tamás and Kovács, András and Monostori, László and Nakano, T and Váncza, József Generating alternative process plans for complex parts | ISI Article | |
2013 | Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem | ISI Article | |
2013 | Cornuejols, G and Kis, Tamás and Molinaro, M Lifting Gomory Cuts With Bounded Variables | ISI Article | |
2013 | Drótos, Márton and Kis, Tamás Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times | ISI Article |
2014
Date | Author/Title | Document Type | |
---|---|---|---|
2014 | Györgyi, Péter and Kis, Tamás Approximation schemes for single machine scheduling with non-renewable resource constraints | Article | |
2014 | Drótos, Márton and Kis, Tamás Car Sequencing with respect to Regular Expressions and Linear Bounds | Book Section | |
2014 | Kis, Tamás Lift-and-project for general two-term disjunctions | Article | |
2014 | Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József An inverse economic lot-sizing approach to eliciting supplier cost parameters | ISI Article | |
2014 | Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József An inverse economic lot-sizing approach to eliciting supplier cost parameters | Article |
2015
Date | Author/Title | Document Type | |
---|---|---|---|
2015-09-06 | Györgyi, Péter and Kis, Tamás Reductions between scheduling problems with non-renewable resources and knapsack problems | ISI Article | |
2015 | Györgyi, Péter and Kis, Tamás Approximability of scheduling problems with resource consuming jobs | Article | |
2015 | Kis, Tamás Approximability of total weighted completion time with resource consuming jobs | Article | |
2015 | Balas, Egon and Kis, Tamás Intersection cuts - standard versus restricted | Article | |
2015 | Györgyi, Péter and Kis, Tamás Reductions between scheduling problems with non-renewable resources and knapsack problems | Article | |
2015 | Bacsó, Gábor and Kis, Tamás and Visegrádi, Ádám and Kertész, Attila and Németh, Zsolt A Set of Successive Job Allocation Models in Distributed Computing Infrastructures | Article |
2016
Date | Author/Title | Document Type | |
---|---|---|---|
2016 | Balas, E and Kis, Tamás On the relationship between standard intersection cuts, lift-and-project cuts, and generalized intersection cuts | Article | |
2016 | Horváth, Markó and Kis, Tamás Solving resource constrained shortest path problems with LP-based methods | Article | |
2016 | Horváth, Markó and Kis, Tamás Solving resource constrained shortest path problems with LP-based methods | Article |
2017
Date | Author/Title | Document Type | |
---|---|---|---|
2017 | Györgyi, Péter and Kis, Tamás Approximation schemes for parallel machine scheduling with non-renewable resources | Article | |
2017 | Kis, Tamás and Drótos, Márton Hard planning and scheduling problems in the digital factory | Book Section |
2018
Date | Author/Title | Document Type | |
---|---|---|---|
2018 | Horváth, Markó and Kis, Tamás Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price | Article | |
2018 | Györgyi, Péter and Kis, Tamás Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut | Article | |
2018 | Györgyi, Péter and Kis, Tamás Minimizing the total weighted completion time in single machine scheduling with non-renewable resource constraints | Book Section | |
2018 | Horváth, Markó and Kis, Tamás Multi-criteria approximation schemes for the resource constrained shortest path problem | Article |
2019
Date | Author/Title | Document Type | |
---|---|---|---|
2019 | Györgyi, Péter and Kis, Tamás Approximation algorithms for single machine schedulingwith non-renewable resources and the total weightedcompletion time | Conference or Workshop Item | |
2019 | Györgyi, Péter and Kis, Tamás Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints | Article | |
2019 | Nattaf, M and Horváth, Markó and Kis, Tamás and Artigues, C and Lopez, P Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem | Article | |
2019 | Györgyi, Péter and Kis, Tamás A probabilistic approach to pickup and delivery problems with time window uncertainty | Article |
2020
Date | Author/Title | Document Type | |
---|---|---|---|
2020 | Egri, Péter and Kis, Tamás Allocating raw materials to competing projects | Article | |
2020 | Horváth, Markó and Kis, Tamás Polyhedral results for position-based scheduling of chains on a single machine | Article | |
2020 | Györgyi, Péter and Kis, Tamás A common approximation framework for early work, late work, and resource leveling problems | Article |
2021
Date | Author/Title | Document Type | |
---|---|---|---|
2021 | Tamási, Tímea and Kis, Tamás Decentralized and prioritized algorithm for AGV fleet management | Article | |
2021 | Kis, Tamás and Kovács, András and Mészáros, Csaba On Optimistic and Pessimistic Bilevel Optimization Models for Demand Response Management | Article | |
2021 | Drótos, Márton and Györgyi, Péter and Horváth, Markó and Kis, Tamás Suboptimal and conflict-free control of a fleet of AGVs to serve online requests | Article |
2022
Date | Author/Title | Document Type | |
---|---|---|---|
2022 | Horváth, Markó and Kis, Tamás and Kovács, András and Fekula, Márk Zoltán Assembly planning by disjunctive programming and geometrical reasoning | Article | |
2022 | Kis, Tamás and Horváth, Markó Ideal, non-extended formulations for disjunctive constraints admitting a network representation | Article | |
2022 | Kis, Tamás and Györgyi, Péter and Tamási, Tímea and Békési, J Joint replenishment meets scheduling | Conference or Workshop Item | |
2022 | Györgyi, Péter and Kis, Tamás New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints | Article | |
2022 | Morapitiye, Sunil and Kis, Tamás Strong cuts from compatibility relations for the Dial-a-Ride Problem | Article | |
2022 | Morin, P-A and Artigues, C and Haït, A and Kis, Tamás and Spieksma, F C R A project scheduling problem with periodically aggregated resource-constraints | Article |
2023
Date | Author/Title | Document Type | |
---|---|---|---|
2023 | Györgyi, Péter and Kis, Tamás and Tamási, Tímea and Békési, József Joint replenishment meets scheduling | Article | |
2023 | Egri, Péter and Dávid, B and Kis, Tamás and Krész, Miklós Robust facility location in reverse logistics | Article | |
2023 | Györgyi, Péter and Kis, Tamás and Tamási, Tímea An online joint replenishment problem combined with single machine scheduling | Article |
2024
Date | Author/Title | Document Type | |
---|---|---|---|
2024 | Dobrovoczki, Péter and Kis, Tamás Facet separation for disjunctive constraints with network flow representation | Article | |
2024 | Kis, Tamás and Szögi, Evelin Scheduling jobs to minimize a convex function of resource usage | Article |