Items where Author is "Kovács, András"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Date | Item Type | No Grouping
Number of items: 82.
DateAuthor/TitleDocument Type
2023Cserteg, Tamás and Erdős, Ferenc Gábor and Horváth, Gergely and Kovács, András
Digital twin assisted workpiece referencing for compensating the stock deviation of casted parts
Article
2023Tsutsumi, D and Bergmann, Júlia and Dobrovoczki, Péter and Hayashi, N and Kovács, András and Szádoczki, Zsombor and Szaller, Ádám and Umeda, S
Dynamic Production Line Re-balancing by Alternative Plans for Compensating Equipment Failures
Article
2023Cserteg, Tamás and Kovács, András and Váncza, József
Multi-operation blank localization with hybrid point cloud and feature-based representation
Article
2023Cserteg, Tamás and Kovács, András and Váncza, József
Multi-operation optimal blank localization for near net shape machining
Article
2022Horváth, Markó and Kis, Tamás and Kovács, András and Fekula, Márk Zoltán
Assembly planning by disjunctive programming and geometrical reasoning
Article
2022Tsutsumi, D and Kovács, András and Szalóki, Ádám
Novel heuristic approach to integrating task sequencing and production system configuration
Article
2022Zahorán, László and Kovács, András
ProSeqqo: A generic solver for process planning and sequencing in industrial robotics
Article
2022Zahorán, László and Kovács, András
ProSeqqo: Open-source Solver for Robotic Task Sequencing
Conference or Workshop Item
2021Kovács, András
Inverse optimization approach to the identification of electricity consumer models
Article
2021Kis, Tamás and Kovács, András and Mészáros, Csaba
On Optimistic and Pessimistic Bilevel Optimization Models for Demand Response Management
Article
2021Tipary, Bence and Kovács, András and Erdős, Ferenc Gábor
Planning and optimization of robotic pick-and-place operations in highly constrained industrial environments
Article
2021Horváth, Gergely and Kardos, Csaba and Kovács, András and Pataki, Balázs and Tóth, S
Worker Assistance Suite for Efficient Human–Robot Collaboration
Book Section
2020Tsutsumi, D and Gyulai, Dávid and Kovács, András and Tipary, Bence and Ueno, Y
Joint optimization of product tolerance design, process plan, and production plan in high-precision multi-product assembly
Article
2020Németh, Balázs and Kovács, András
Robot path planning over a sequence of points specified in task space
Conference or Workshop Item
2020Kardos, Csaba and Kovács, András and Váncza, József
A constraint model for assembly planning
Article
2019Kovács, András
Bilevel Programming Approach to Demand Response Management with Day-ahead Tariff
Article
2019Zahorán, László and Kovács, András
Efficient collision detection for path planning for industrial robots
Book Section
2019Kovács, András
Parameter Elicitation for Consumer Models in Demand Response Management
Book Section
2018Kardos, Csaba and Kemény, Zsolt and Kovács, András and Pataki, Balázs and Váncza, József
Context-dependent multimodal communication in human-robot collaboration
Article
2018Kardos, Csaba and Kovács, András and Pataki, Balázs and Váncza, József
Generating HumanWork Instructions from Assembly Plans
Conference or Workshop Item
2018Horváth, Gergely and Kardos, Csaba and Kemény, Zsolt and Kovács, András and Pataki, Balázs and Váncza, József
Multi-Modal Interfaces for Human–Robot Communication in Collaborative Assembly
Article
2018Kovács, András
On the Computational Complexity of Tariff Optimization for Demand Response Management
Article
2018Tsutsumi, D and Gyulai, Dávid and Kovács, András and Tipary, Bence and Ueno, Y and Monostori, László
Towards joint optimization of product design, process planning and production planning in multi-product assembly
Article
2017Kardos, Csaba and Kovács, András and Váncza, József
Decomposition approach to optimal feature-based assembly planning
Article
2016Kovács, András
Bilevel programming approach to optimizing a time-variant electricity tariff for demand response
Book Section
2016Kovács, András
Integrated task sequencing and path planning for robotic remote laser welding
Article
2016Kovács, András and Bátai, Roland and Csáji, Balázs Csanád and Dudás, Péter and Háy, Borbála and Pedone, Gianfranco and Révész, Tibor and Váncza, József
Intelligent control for energy-positive street lighting
Article
2016Csáji, Balázs Csanád and Kovács, András and Váncza, József
Online Learning for Aggregating Forecasts in Renewable Energy Systems
Article
2016Erdős, Ferenc Gábor and Kovács, András and Váncza, József
Optimized joint motion planning for redundant industrial robots
Article
2016Erdős, Ferenc Gábor and Kardos, Csaba and Kemény, Zsolt and Kovács, András and Váncza, József
Process planning and offline programming for robotic remote laser welding systems
Article
2016Erdős, Ferenc Gábor and Kardos, Csaba and Kemény, Zsolt and Kovács, András and Váncza, József
Process planning and offline programming for robotic remote laser welding systems
Article
2016Kardos, Csaba and Kovács, András and Váncza, József
Towards Feature-based Human-robot Assembly Process Planning
Article
2015Kovács, András
Integrated task sequencing and path planning for robotic remote laser welding
Article
2014Csáji, Balázs Csanád and Kovács, András and Váncza, József
Adaptive Aggregated Predictions for Renewable Energy Systems
Book Section
2014Gyulai, Dávid and Kádár, Botond and Kovács, András and Monostori, László
Capacity management for assembly systems with dedicated and reconfigurable resources
Article
2014Kovács, András
Collision-free Path Planning for Remote Laser Welding
Book Section
2014Bátai, R and Balázs, L and Révész, Tibor and Pedone, Gianfranco and Kovács, András and Prikler, L
E+GRID: Energy-positive adaptive street lighting
Book Section
2014Csáji, Balázs Csanád and Háy, Borbála and Kovács, András and Pedone, Gianfranco and Révész, Tibor and Váncza, József
Monitoring and Controlling Energy-positive Public Lighting: the E+grid System
Article
2014Csáji, Balázs Csanád and Kovács, András and Váncza, József
Prediction and Robust Control of Energy Flow in Renewable Energy Systems
Book Section
2014Erdős, Ferenc Gábor and Kardos, Csaba and Kemény, Zsolt and Kovács, András and Váncza, József
Workstation Configuration and Process Planning for RLW Operations
Article
2014Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József
An inverse economic lot-sizing approach to eliciting supplier cost parameters
ISI Article
2014Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József
An inverse economic lot-sizing approach to eliciting supplier cost parameters
Article
2013Kis, Tamás and Kovács, András
Exact solution approaches for bilevel lot-sizing
ISI Article
2013Nonaka, Y and Erdős, Ferenc Gábor and Kis, Tamás and Kovács, András and Monostori, László and Nakano, T and Váncza, József
Generating alternative process plans for complex parts
ISI Article
2013Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József
Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem
ISI Article
2013Erdős, Ferenc Gábor and Kemény, Zsolt and Kovács, András and Váncza, József
Planning of remote laser welding processes
Article
2013Kovács, András
Task Sequencing for Remote Laser Welding in the Automotive Industry
Conference or Workshop Item
2012Egri, Péter and Kis, Tamás and Kovács, András and Váncza, József
An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters
Conference or Workshop Item
2012Kis, Tamás and Kovács, András
On bilevel machine scheduling problems
ISI Article
2012Kis, Tamás and Kovács, András
A cutting plane approach for integrated planning and scheduling
ISI Article
2011Kovács, András and Kis, Tamás
Constraint programming approach to a bilevel scheduling problem
ISI Article
2011Kovács, András
Optimizing the storage assignment in a warehouse served by milkrun logistics
ISI Article
2011Kovács, András and Erdős, Ferenc Gábor and Monostori, László and Viharos, Zsolt János
Scheduling the maintenance of wind farms for minimizing production loss
Conference or Workshop Item
2011Kovács, András and Csempesz, János and Erdős, Ferenc Gábor and Karnok, Dávid and Kemény, Lőrinc and Monostori, László and Viharos, Zsolt János
WindMT: An integrated system for failure detection and maintenance scheduling at wind farms
Conference or Workshop Item
2011Kovács, András and Beck, J
A global constraint for total weighted completion time for unary resources
ISI Article
2011Kovács, András and Erdős, Ferenc Gábor and Viharos, Zsolt János and Monostori, László
A system for the detailed scheduling of wind farm maintenance
Article
2010-08-23Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József
Approaches to inventory management in supply chains: a comparative study
Conference or Workshop Item
2010-05-26Kovács, András and Váncza, József
Exploiting repetitive patterns in practical scheduling problems
Conference or Workshop Item
2010-05-25Viharos, Zsolt János and Erdős, Ferenc Gábor and Kovács, András and Monostori, László
Artificial intelligence applications for maintenance oriented health monitoring of wind turbines
Conference or Workshop Item
2010-04-20Viharos, Zsolt János and Monostori, László and Erdős, Ferenc Gábor and Kovács, András
AI supported maintenance and reliability system in wind energy production
Conference or Workshop Item
2010Monostori, László and Erdős, Ferenc Gábor and Kádár, Botond Géza and Kis, Tamás and Kovács, András and Pfeiffer, András and Váncza, József
Digital enterprise solution for integrated production planning and control
Article
2009Monostori, László and Viharos, Zsolt János and Erdős, Ferenc Gábor and Kovács, András
AI supported maintenance and reliability system in wind energy production
Conference or Workshop Item
2009Kovács, András and Kis, Tamás
Constraint programming approach to a bilevel scheduling problem
Conference or Workshop Item
2009Kovács, András and Brown, Kenneth N. and Tarim, S. Armagan
An Efficient MIP Model for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups
Article
2009Kovács, András and Brown, K. N. and Tarim, S. A.
An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
ISI Article
2008Kovács, András
Optimizing the Storage Assignment in a Warehouse Served by Milkrun Logistics
Conference or Workshop Item
2008Kovács, András and Beck, J. Christopher
A global constraint for total weighted completion time for cumulative resources
ISI Article
2007Kovács, András and Beck, J. Christopher
Constraint-based scheduling with total completion time criterion: models and applications
Conference or Workshop Item
2007Kovács, András and Beck, J. Christopher
Extensions of the COMPLETION constraint
Conference or Workshop Item
2007Kovács, András and Beck, J. Christopher
Single-machine scheduling with tool changes: a constraint-based approach
Conference or Workshop Item
2007Kovács, András and Beck, J. Christopher
A global constraint for total weighted completion time
Conference or Workshop Item
2006Kovács, András and Brown, KN and Tarim, SA
An Efficient MIP Formulation for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups
Conference or Workshop Item
2006Kovács, András
Novel models and algorithms for integrated production planning and scheduling
Thesis
2006Kovács, András and Váncza, József
Progressive solutions: a simple but efficient dominance rule for practical RCPSP
ISI Article
2006Monostori, László and Váncza, József and Márkus, András and Kis, Tamás and Kovács, András and Erdős, Ferenc Gábor and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises: management of changes and disturbances in different levels of production
Article
2006Kis, Tamás and Drótos, Márton and Erdős, Ferenc Gábor and Kovács, András
The interval flow shop model
Conference or Workshop Item
2005Kovács, András and Egri, Péter and Váncza, József
Integrált termeléstervezés és ütemezés megrendelésre történő gyártásban
Article
2005Egri, Péter and Kovács, András and Márkus, A. and Váncza, József
Project-oriented approach to production planning and scheduling in make-to-order manufacturing
Article
2005Kovács, András and Egri, Péter and Kis, Tamás and Váncza, József
Proterv-II: an integrated production planning and scheduling system
Article
2005Monostori, László and Váncza, József and Márkus, A. and Kis, Tamás and Kovács, András and Erdős, P. and Kádár, Botond and Viharos, Zsolt János
Real-time, cooperative enterprises: management of changes and disturbances on different levels of production
Conference or Workshop Item
2005Kovács, András and Márkus, A. and Váncza, József
Structural exploration of constraint-based scheduling problems
Article
2003Kovács, András and Váncza, József and Kádár, Botond Géza and Monostori, László and Pfeiffer, András
Real-life scheduling using constraint programming and simulation
Article
This list was generated on Fri Apr 19 03:09:47 2024 CEST.