Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut
Györgyi, Péter and Kis, Tamás (2018) Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut. COMPUTERS AND INDUSTRIAL ENGINEERING, 115. pp. 220-225. ISSN 0360-8352 10.1016/j.cie.2017.11.016
|
Text
Gyorgyi_220_3305793_ny.pdf Download (314kB) | Preview |
|
Text
Gyorgyi_220_3305793_z.pdf Restricted to Registered users only Download (297kB) |
Item Type: | Article |
---|---|
Subjects: | Q Science > QA Mathematics and Computer Science > QA75 Electronic computers. Computer science / számítástechnika, számítógéptudomány |
Divisions: | Research Laboratory on Engineering & Management Intelligence |
SWORD Depositor: | MTMT Injector |
Depositing User: | MTMT Injector |
Date Deposited: | 21 Dec 2017 08:12 |
Last Modified: | 21 Jul 2019 13:50 |
URI: | https://eprints.sztaki.hu/id/eprint/9281 |
Update Item |