Items where Author is "Györgyi, Péter"
Up a level |
Number of items: 21.
2014
Date | Author/Title | Document Type | |
---|---|---|---|
2014 | Györgyi, Péter and Kis, Tamás Approximation schemes for single machine scheduling with non-renewable resource constraints | Article |
2015
Date | Author/Title | Document Type | |
---|---|---|---|
2015-09-06 | Györgyi, Péter and Kis, Tamás Reductions between scheduling problems with non-renewable resources and knapsack problems | ISI Article | |
2015 | Györgyi, Péter and Kis, Tamás Approximability of scheduling problems with resource consuming jobs | Article | |
2015 | Györgyi, Péter and Kis, Tamás Reductions between scheduling problems with non-renewable resources and knapsack problems | Article |
2017
Date | Author/Title | Document Type | |
---|---|---|---|
2017 | Györgyi, Péter and Kis, Tamás Approximation schemes for parallel machine scheduling with non-renewable resources | Article | |
2017 | Györgyi, Péter A PTAS for a resource scheduling problem with arbitrary number of parallel machines | Article |
2018
Date | Author/Title | Document Type | |
---|---|---|---|
2018 | Györgyi, Péter and Kis, Tamás Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut | Article | |
2018 | Györgyi, Péter and Kis, Tamás Minimizing the total weighted completion time in single machine scheduling with non-renewable resource constraints | Book Section | |
2018 | Györgyi, Péter and Hujter, B and Kisfaludi-Bak, S On the number of touching pairs in a set of planar curves | Article |
2019
Date | Author/Title | Document Type | |
---|---|---|---|
2019 | Györgyi, Péter and Kis, Tamás Approximation algorithms for single machine schedulingwith non-renewable resources and the total weightedcompletion time | Conference or Workshop Item | |
2019 | Györgyi, Péter and Kis, Tamás Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints | Article | |
2019 | Györgyi, Péter and Kis, Tamás A probabilistic approach to pickup and delivery problems with time window uncertainty | Article |
2020
Date | Author/Title | Document Type | |
---|---|---|---|
2020 | Györgyi, Péter and Kis, Tamás A common approximation framework for early work, late work, and resource leveling problems | Article |
2021
Date | Author/Title | Document Type | |
---|---|---|---|
2021 | Bentert, M and Bredereck, R and Györgyi, Péter and Kaczmarczyk, A and Niedermeier, R A Multivariate Complexity Analysis of the Material Consumption Scheduling Problem | Article | |
2021 | Drótos, Márton and Györgyi, Péter and Horváth, Markó and Kis, Tamás Suboptimal and conflict-free control of a fleet of AGVs to serve online requests | Article |
2022
Date | Author/Title | Document Type | |
---|---|---|---|
2022 | Kis, Tamás and Györgyi, Péter and Tamási, Tímea and Békési, J Joint replenishment meets scheduling | Conference or Workshop Item | |
2022 | Györgyi, Péter and Kis, Tamás New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints | Article |
2023
Date | Author/Title | Document Type | |
---|---|---|---|
2023 | Fischer, D and Györgyi, Péter Approximation algorithms for coupled task scheduling minimizing the sum of completion times | Article | |
2023 | Györgyi, Péter and Kis, Tamás and Tamási, Tímea and Békési, József Joint replenishment meets scheduling | Article | |
2023 | Bentert, M and Bredereck, R and Györgyi, Péter and Kaczmarczyk, A and Niedermeier, R A multivariate complexity analysis of the material consumption scheduling problem | Article | |
2023 | Györgyi, Péter and Kis, Tamás and Tamási, Tímea An online joint replenishment problem combined with single machine scheduling | Article |