Items where Author is "Beck, J. Christopher"
Up a level |
Number of items: 5.
Date | Author/Title | Document Type | |
---|---|---|---|
2008 | Kovács, András and Beck, J. Christopher A global constraint for total weighted completion time for cumulative resources | ISI Article | |
2007 | Kovács, András and Beck, J. Christopher Constraint-based scheduling with total completion time criterion: models and applications | Conference or Workshop Item | |
2007 | Kovács, András and Beck, J. Christopher Extensions of the COMPLETION constraint | Conference or Workshop Item | |
2007 | Kovács, András and Beck, J. Christopher Single-machine scheduling with tool changes: a constraint-based approach | Conference or Workshop Item | |
2007 | Kovács, András and Beck, J. Christopher A global constraint for total weighted completion time | Conference or Workshop Item |